Skip to content
LIGHT DEY?

Where our data comes from

Light Dey? combines independent evidence and always shows which source each status comes from. We never present an estimate, a stale report or a single unverified report as confirmed live electricity. When trustworthy data is missing, the area shows Not enough current evidence and asks you to help confirm.

How evidence is ranked

  1. Measured (a healthy Light Dey sensor) or official outage data → “Confirmed”. Grid figures expire after 90 minutes.
  2. Indirect evidence (a degraded sensor, one behind a generator changeover, or 2 verified reporters agreeing) → “Likely”.
  3. One verified reporter → “Reported” straight away.
  4. Community → “Reported” when 3+ independent people agree within 60 minutes.
  5. Estimate → only with no live evidence, from ≥6 past confirmed hours at least 70% one way.

Official grid data can prove an outage (a national grid collapse, or a DisCo receiving ~0 MW) but not that your street has light, because DisCos load-shed. So positive grid figures are shown as context only.

Sources

NISO Grid Data Portal (NIGGRID)

Live
Trust tier
1 — official grid
Coverage
National grid; per-DisCo load allocation (incl. Eko and Ikeja DisCos)
Used for
Outage only: national grid collapse (total allocation below threshold) affects every area; a DisCo at ~0 MW affects only areas officially mapped to it. Positive MW is context, never 'light dey'.
Refresh
every 10 min
Reliability
Official system-operator figures, published as a public web page (no API). Updates roughly hourly.
Link
https://www.niggrid.org/DisCoLoadProfile

Ikeja Electric public notices (RSS)

Live
Trust tier
1 — official disco
Coverage
Ikeja Electric franchise area (northern Lagos)
Used for
Context only: notices that name a supported area are linked on that area's page. Never sets a live status.
Refresh
every 60 min
Reliability
Official DisCo notices. Free text; feeder lists are often images, so areas are matched by name only.
Link
https://www.ikejaelectric.com/feed/

Eko Electricity Distribution (EKEDP) notices

No accessible feed
Trust tier
1 — official disco
Coverage
Eko DisCo franchise area (southern Lagos)
Used for
None yet.
Refresh
—
Reliability
Official, but published on social media and the website as free text/images.
Link
https://ekedp.com/

DisCo / TCN / NISO posts on X

Needs API credentials
Trust tier
1 — official disco
Coverage
Lagos DisCos, TCN, NISO
Used for
Would be context-only notices, like the Ikeja Electric feed.
Refresh
—
Reliability
Official accounts, free text.
Needs
X_BEARER_TOKEN (paid X API tier)
Link
https://developer.x.com/

Light Dey Sensor (opt-in mains-detection devices)

Implemented — needs devices
Trust tier
1 — telemetry
Coverage
The neighbourhood each device is registered to (no address or precise location)
Used for
Measured status: a healthy grid-direct sensor => Confirmed; degraded/late or behind a changeover => Likely; silence => offline (never an outage).
Refresh
every 1 min
Reliability
Direct measurement at one point on one feeder. Strong when healthy, fresh and wired before any generator changeover; independent sensors (separate networks) raise confidence.
Needs
Per-device id + derived HMAC secret (`npm run sensor:provision`); SENSOR_MASTER_SECRET on the server

IODA internet connectivity (Georgia Tech) — Lagos region

Implemented — awaiting permission (off)
Trust tier
4 — proxy
Coverage
Lagos State as a whole (region 2935) — too coarse for neighbourhoods
Used for
Context only, Lagos-wide: 'connectivity drop detected'. Never sets or changes a status.
Refresh
every 15 min
Reliability
Weak proxy: generators, inverters and mobile networks keep internet up during grid outages, and internet fails for other reasons.
Needs
Written permission from IODA (data-info contact) — API responses state 'All Rights Reserved'
Link
https://api.ioda.inetintel.cc.gatech.edu/v2/

Victron VRM (inverter monitoring) — opt-in installations

Needs API credentials
Trust tier
1 — device provider
Coverage
Per consenting installation
Used for
Would map 'AC input present' to a grid-direct reading only if the install is wired before any changeover.
Refresh
—
Reliability
Documented public API exposing inverter AC-input state; untested by us.
Needs
Per-installation access token issued by the owner (consent)
Link
https://vrm-api-docs.victronenergy.com/

Shelly Cloud (smart plugs / relays) — opt-in devices

Needs API credentials
Trust tier
1 — device provider
Coverage
Per consenting device
Used for
Candidate source of grid-direct voltage readings.
Refresh
—
Reliability
Device online/offline is NOT mains evidence (Wi-Fi, UPS); only a plug wired to raw grid power and reporting a voltage would be.
Needs
Owner's Shelly Cloud auth key (consent)
Link
https://shelly-api-docs.shelly.cloud/

Transmission Company of Nigeria website

Rejected
Trust tier
1 — official grid
Coverage
National transmission
Used for
None. TCN outage updates are posted on X (paid API — see x_disco_accounts).
Refresh
—
Reliability
Official, but the 'Notices' page holds procurement PDFs, not outage notices (checked 2026-11-14).
Link
https://www.tcn.org.ng/

Lagos State Electricity Regulatory Commission

Rejected
Trust tier
1 — regulator
Coverage
Lagos State
Used for
None.
Refresh
—
Reliability
No reachable website found (checked 2026-11-14).

Downdetector, Google 'popular times', road cameras, social posts

Rejected
Trust tier
4 — proxy
Coverage
Varies
Used for
None.
Refresh
—
Reliability
Terms forbid scraping, or no verifiable public feed with location and time; generators make them poor power evidence anyway.

Verified partners (businesses, security desks, facilities, community organisations)

Awaiting approved partners
Trust tier
2 — verified partner
Coverage
Per partner agreement
Used for
Reports via POST /api/ingest/observations: one fresh report => 'Reported'; two independent (or one + neighbours) => 'Likely'. Never 'Confirmed' — only official data or sensors confirm.
Refresh
—
Reliability
Vetted human observers; each partner is a separate source with its own key and approved areas.
Needs
Partner API key issued with `npm run partner:key`

Verified community reporters

Awaiting approved partners
Trust tier
2 — verified reporter
Coverage
Per reporter's home neighbourhood
Used for
Neighbourhood status reports via the ingestion API.
Refresh
—
Reliability
Vetted individuals. One fresh report => 'Reported'; two independent (or one plus neighbours) => 'Likely'.
Needs
Per-reporter API key issued with `npm run partner:key`

Light Dey? community reports

Live
Trust tier
3 — community
Coverage
All supported Lagos neighbourhoods
Used for
Community-reported light / no light, or conflicting.
Refresh
—
Reliability
Anonymous, rate-limited, deduplicated. Needs several independent reporters (max 2 per network) within 60 minutes — see /about for the current threshold.

NERC quarterly & energy-cap reports

No accessible feed
Trust tier
1 — regulator
Coverage
National, per DisCo, per feeder (monthly/quarterly)
Used for
None for live status. Candidate for feeder→area mapping research (LD-049).
Refresh
—
Reliability
Official but historical PDFs; not live.
Link
https://nerc.gov.ng/

Historical pattern estimate

Live (derived)
Trust tier
4 — estimate
Coverage
Areas with enough confirmed community history
Used for
Shown only when there is no live evidence, labelled 'Estimate'. Needs ≥6 confirmed hours at this hour and ≥70% one way.
Refresh
every 60 min
Reliability
Statistical: share of past confirmed hours at this time of day. Not live.

Which DisCo serves each area

DisCo-wide outages only apply to areas an official source names: an Eko DisCo district or an Ikeja Electric business unit with the same name. Other areas aren’t mapped yet, so only national grid collapses and local reports apply to them.

  • Lekki Phase 1 → Eko DisCo (EKEDP) (Eko DisCo 'Lekki' district, source)
  • Ajah → Eko DisCo (EKEDP) (Eko DisCo 'Ajah' district, source)
  • Lagos Island → Eko DisCo (EKEDP) (Eko DisCo 'Islands' / 'Ajele' districts, source)
  • Apapa → Eko DisCo (EKEDP) (Eko DisCo 'Apapa' district, source)
  • Festac Town → Eko DisCo (EKEDP) (Eko DisCo 'Festac' district, source)
  • Ojo → Eko DisCo (EKEDP) (Eko DisCo 'Ojo' district, source)
  • Mushin → Eko DisCo (EKEDP) (Eko DisCo 'Mushin' district, source)
  • Ikeja → Ikeja Electric (Ikeja Electric 'Ikeja' business unit, source)
  • Ikorodu → Ikeja Electric (Ikeja Electric 'Ikorodu' business unit, source)
  • Oshodi → Ikeja Electric (Ikeja Electric 'Oshodi' business unit, source)
  • Shomolu → Ikeja Electric (Ikeja Electric 'Shomolu' business unit, source)